“Kyiv” (Juliany) Airport
Implementation of the work t o estimate technical condition assessment and certification of CP of the “Kyiv” (Juliany) buildings.
Start and finish dates: September 2014 – July 2014
Customer – “Kyiv” (Juliany) International Airport municipal enterprise
The aim of this work was to determine the complexity of the construction, technical inspection, and tonnage drawings.
Main stages:
- Development of technical assignment;
- Conducting the survey;
- Assessment of the actual technical condition;
- Tonnage drawings;
- Architectural solutions;
- Arrangement of report.
As a result of this work it was carried out inspection of the technical state of structures and elements of buildings (buildings); conclusions about the technical condition of buildings and structures in general at this stage of their existence; are general recommendations for the safe and reliable exploitation of buildings and maintain their structural elements in the work of capable state.