Cheklists of the finishing works with the use of dry construction mixtures “Plato” TM production ODO “SINIAT”
Customer: “SNIT”SOCIETY WITH ADDITIONAL RESPONSIBILITY
Deadline 2015 – 16
The purpose: development of technological maps on the finishing works with the use of “SINIAT” dry construction mixtures
Stages of work:
- Introduction, analysis of the task and underlying data.
- Development of technological maps.
- Making technological maps.
- The preparation of the report.
As a result of work it was developed and designed cheklists for execution of finishing works with the use of “SINIAT” dry construction mixtures