Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Gorenychi village, Kyiv – Svyatoshynsky district, Kyiv region

Topographical removal to scale 1: 500 with a contour interval of 0.5 m land area of 23 hectares for the construction of “Gorenychi.” State Olympic training center.

Location of plot: Gorenychi village, Stolychna 1street, Kiev -Sviatoshynsky district, Kyiv region.

The period of performing work – October-November 2012.

Customer: State Enterprise “Combining of sports and economic outbuildings”

Main stages:

– Field works:

  1. a) Searching for points of geodetic networks;
  2. b) Creation of Planning and vertical networks;
  3. c) Topographic and geodetic removal;
  4. d) Searching for and removing underground utilities;

– Cameral works:

  1. d) Processing of field measurements;
  2. f) Preparation of topographical plans;
  3. i) A technical report;
  4. c) Transfer the materials to the customer;

      In the result of the work it was compiled topographical plan to scale 1: 500 meter of the items displayed on it the situation and terrain, geodetic points network, existing buildings, facilities and utilities, which then used to create the project documentation.