Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Complication of testing programs of pile via static load

        The sector of foundations construction in difficult conditions performs this service for confirmation of holding capacity of piles taken in the project (stage “P”), indicating the use of instruments and tools, as well as designs thrust stand and anchor piles depending on geological conditions.

 Development of the piles test is necessary in all cases with requirements:

 SBC V.2.1-10-2009 “Bases and foundations of buildings.”

B.V.2.1-27 ISO: 2010 “Piles. Determination of bearing capacity according results of field trials. “

B.V.2.1-1-95 GOST (GOST 5686-94) ‘Soils. Methods of field piles test.”

       Test program provides an opportunity to use alternative design and technology driving arrangement (more economical).

       In the construction sector foundations in difficult conditions we the following works with testing  programs of  piles:

Drawing up a comprehensive program of research of bushes of tests on piles at residential apartment building with social – household assignment, Horenychi village, Kiev Sviatoshynsky district, Kyiv region. 2008.

Preparation of the test program of research piles at the site of the complex of multi-building facilities within the Bulgakov, Vyshneva, L. Ukrayinky street of new highway, Bucha, Kyiv region. 2008.

Development of the static tests program of bored piles at the  “memorial complex to victims of famines in Ukraine” on the Hetman Mazepa 15-a street, iPechersk district, Kyiv.2008r.

The development of the program and conduct tests of the piles at the site of construction of hotel complex with apartments on the Antonovich 44 street, Holosiivsky district, Kyiv. 2012.

Specialists who provide this service

Objects where the service was provided

Our projects
"SE "RIBP" - your solving of every building tasks!"