Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Municipal Clinical Hospital № 1, Kyiv

“Тechnical survey of the tecgnical conditions of basic structures containing obstetric corps of Municipal Clinical Hospital № 1 across Kharkiv highway, 121 in Kyiv, for the possibility of reconstruction in the form of add-ins and extension of additional facilities (according to SBS V.3.1-1- 2002). “

Start and finish dates – July – October 2011.

Customer – “Poznyaki -INVEST” municipal enterprise

Main stages:

  • Familiarization with the available technical documentation and drafting of the research sequence.
  • Visual and instrumental inspection of the technical state of the main retaining structures;
  • Determination of strength of wall materials (brick and mortar) via laboratory methods based on taken samples;
  • Office processing of research results;
  • Conducting of testing calculations of soil basis under the most loaded foundations and piers of the ground floor.
  • Development of the report with relevant conclusions and recommendations.

After the survey of technical condition of basic containing constructions of obstetric corps in Municipal Clinical Hospital № 1 across Kharkiv Highway 121 in Kiev it was developed conclusions and recommendations for the possibility of reconstruction in the form of add-ins and extension of additional facilities (according to SBS V.3.1-1- 2002).

Our projects
"SE "RIBP" - your solving of every building tasks!"