Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Examination of changes №3 SDA B D. 2.2.-13617440-001:2012 “Resourceelemental estimate standards for construction works. Airports”

The work was fulfilled by: the professionals of research of the cost of construction, valuation and development of estimates sector of SE “RIBP” under the direction of the head of sector Yachmeniova J. V.

Customer – LLC “Altcom”Road construction “

Provided services: Examination of changes №3  SDA B D.2.2.-13617440-001:2012 “Resource elemental estimate standards for construction works. Airports”

The start and end dates March – April 2013

Main stages:

  • Studying of technical solutions for customer’s materials.
  • Studying of the draft of normative document (ND).
  • Analysis of calculation of the normative document draft on the customer’s materials.
  • Preparation of the work program.
  • Preparation of technical specifications.
  • It was analyzed labour cost; the average grade level of work defined for the link workers; labor costs of drivers; the list of machines and mechanisms, mechanized tools and time of their operation; costs of construction materials, products and structures.
  • Performance of duplicate calculations.
  • Determining the quality of the ND project by identifying deviations from requirements of the legislation of Ukraine in the sphere of road construction.
  • Providing comments.

Results –  it was examined changes№ 3 SDA B D. 2.2.-13617440-001:2012 “Resource elemental estimate standards for construction works. Airports” in accordance with all requirements and regulations of the current legislation and was provided with comments.

(Русский) Наши услуги

(Русский) Наши специалисты

Our projects
"SE "RIBP" - your solving of every building tasks!"