Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

The list of studies of the cost of construction, valuation and development of cost estimates sector during 2012-2015

  1. Development REKN for arrangement ofburied piles with a diameter of 620 mm with a length of up to 24.00 m in sandy soils with a high level of surface water in the construction of residential-office complex with underground Parking in the 4-a district residential area Poznyaki Darnytskyi districtof Kyiv and RCN of machinesoperation and mechanisms “Casagrande C 800 drilling rig ” , “Casagrande 250 drilling rig “.
  2. Examination of the SOU 2.2-33437218-XXX:20XX “Resource element estimate standards for construction work “Laying of pipelines by horizontal directional drilling” and SOU B D .2.7-33437218-XXX:20XX “Resource estimate norms of operation of machines and mechanisms. Complex machines and mechanisms for laying of pipelines by horizontal directional drilling”
  3. Examination of changes №13 to the SDA B. 2.2-13617440-001012 Resource elements, estimate standards for construction work in Airfield.
  4. Making up drafts for major repairs to prevent further destruction of the attic above the Large conference hall of the Main building of the Government House on M. Grushevskoho 12/2Street,in Pechersk district of Kyiv.
  5. Examination of DR B d. 2.2-33663346-014:2013 Resource element estimate standards for construction work “Dredging works in the water area of GP “MPT “South” in the area of quays№18-20″, DR B. d. 2.2-33663346-015:2013 Resource element estimate standards for construction work “Dredging for the reconstruction of the sea channel and inland waterway approaches to deep-water berths SE “ICC “South”, PR B 2.2-33663346-005:2013 Resource element estimate standards for construction work “Grantown self-dumping scows to transport the soil, the carrying capacity of 1500t. self-propelled boom earth shell bucket capacity 20 m3”
  6. Examination of DR B d. 2.2-33663346-016:2013 Resource element estimate standards for construction work “Dredging for the reconstruction of the sea channel and inland waterway approaches to deep-water berths SE “ICC “South”. The development of soils-self-propelled projectiles land with dosenna self-propelled barges on the sea blade”
  7. Participation in the examination of OL B 2.2-26507771-002:20132013 Resource element estimate standards for construction work “Development, ground transportation from the location of the fence with the loading on the underwater landfill Samode bilge suction pipes-regularnie power is 11200 kW, capacity-based hold 13392 m3 when working in the SE ” Illichivsk sea commercial port”
  8. The examination of the projects of the SDA 2.4-01190043-001:2013 Resource element estimate standards for construction and maintenance work. Regulation of the constant efforts to braces metal radio and TV masts”
  9. An examination of SOU B D .2.7-23884450-001:201Х “Resource estimate norms of operation of machines and mechanisms. Complex machines and mechanisms for construction work on the laying of pipelines by horizontal directional drilling” and SDA 2.2-23884450-002:201Х “Resource element estimate standards for construction work “Laying of pipelines by horizontal directional drilling method”
  10. Examination of DR B d. 2.2-33663346-012:2013 Resource element estimate standards for construction work “Dredging works for construction of berths № 10,11 operating area in SE “ICC “Yujnyi”.
  11. Examination of DR B d. 2.2-33663346-013:2013 Resource element estimate standards for construction work “Dredging of the existing approach channel to the port and adjoining area during the construction of the 1st and 2nd lap and the new part of the 3rd knee of the marine approach channel of the port of SE “ICC “Yujnyi”
  12. Examination of DR B d. 2.2-33663346-009:2013 Resource element estimate standards for construction work “Maintenance dredging at berths 3-4,9 SE “MPT “South” and the approaches to them”, DR B. d. 2.7-33663346-004:2013 Resource estimate norms of operation of construction machinery “, Lifting non-self-propelled cranes withfloating capacity of 32 t”
  13. Examination of DR B d. 2.2-33663346-010:2013 Resource element estimate standards for construction work “Development, ground transportation from the location of intake and discharge on the marine underwater dump via bilge suction pipes Samode-regularnie power 11295 kW capacity based hold 5500 m3”
  14. Examination, ETC., 2.2 – 3375711-00:2014 “Resource element estimate standards for construction work. Preparation mix asphalt and black gravel on the asphalt plant, rated power from 130t/h to 160 t/h”, ETC., 2.7 – 3375711-01:2014 “Resource estimate norms of operation of machines and mechanisms. A plant for preparing asphalt mix with remote control, rated power from 130t/h to 160 t/h when operating on diesel fuel. Loaders front shovel, New Holland 190B wheel type move, the bucket capacity 3.5 m3”
  15. Examination of the SDA 2.2-00131305-001:201Х Resource element estimate standards for construction work. Device pipeline made of pipes “ISOPROFLEX-A” and “ISOPROFLEX-115A” and SDA 2.2-00131305-002:201Х Resource estimate norms of operation of machines and mechanisms. The device for the installation of insulation pipes.
  16. Examination of the SDA 2. 4-30734471-XXX:20XX 201Х Resource element estimate standards for construction and maintenance work. “Dismantling and installation of special equipment shelters and structures”
  17. Examination of DR B d. 2.2-33663346-011:2013 Resource element estimate standards for construction work “Development of soil suction pipes, bilge Samode-regularnie power 11295 kW capacity based hold 5500 m3 when performing dredging works on reconstruction of marine approach channel and inland waterway approaches to deep-water berths SE “MPT “South”
  18. Examination of the draft GBN V. 2.3-37641918-552:201Х “roads. The definition of categories of complexity of objects of road construction”
  19. Analysis of conformity of actually performed volume of works of project documentation on the object: “Reconstruction of the maternity hospitals in Lviv”
  20. Development of the draft amendment 1 DBC.2.2-3-2012 “Composition and content of project documentation for construction”
  21. Examination of SOUD.2.2-37024912-001:201Х “Resource element estimate standards for construction work. Waterproofing of expansion joints, cracks, junctions, inlets of engineering communications and veil waterproofing of concrete, reinforced concrete and brick structures using injection” and SDA 2.7 – 37024912-001:201Х “Resource estimate norms of operation of machines and mechanisms. Pump pneumatic two-component injection”
  22. The establishment of normal labour processes and generalization of normative observations in the construction of a Cement plant in the Leninsky district of Crimea on the basis of Krasnopartizanskiy limestone. Deposit capacity of 3 million tonnes of clinker per year
  23. The definition of the work of the Customer on the content of suspended construction projects: “Reconstruction Slithering sewage collector D=600-700-900-1200-1450-2450мм”, “Construction of the sewer from the Mościcki Main city in Kyiv”, “Reconstruction of sewage collector D=2400 mm on the . Lebedeva street in the Dnipro district of Kyiv”, “Reconstruction of sewage collector D=1000-1200 mm St. Degtyarenko, Construction of water supply network D=1400 mm from the street Grechko to the Great ring road in Podilskyi district, Shevchenko and Svyatoshinsky districts Kyiv”, “Construction of the southwest sewer (I-V p. K.) in Kyiv”, “Reconstruction through manifold water supply system D=1400 mm from the metro station “Dnipro” in Kyiv”, “Construction of the sewer on StetsenkoStreet to eliminate the KNU Nivki in Kyiv”
  24. Examination of ETC., 2.2-33663346-008:2013 Resource element estimate standards for construction work. The construction of the 1st and 2nd new knee part 3-of the tribe of sea approach channel of the port “South”, ETC., 2.2-33663346-007:2013 Resource element estimate standards for construction work. Dredging of the existing approach channel to the port and adjoining area during the construction and 2-of the tribe of the new part of the 3rd knee of the marine approach channel of the port “Yijnyi”
  25. Examination, ETC., 2.2-33663346-016:2013 Resource element estimate standards for construction work. The dredging works on reconstruction of marine approach channel and inland waterway approaches to deep-water berths SE “ICC “Yujnyi”. The development of soils-self-propelled projectiles land with dosenna self-propelled barges on the sea blade”
  26. Developing estimates for a project to restore the bearing capacity of the floor slabs of the workshop № 1 in axes 11-13/A-B at elevation +4.800 for DE Kyiv offset factory, Heroiv Dnipra Street, Kyiv”