Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Carrying out engineering-geodetic observations for settlement of a building of pump station №4 on Kurganska 4 street in Pecherskyi district of Kyiv

Engineering-geodetic works on observations of precipitation were performed by specialists of the Department of instrumental control of construction and installation works under the direction of the head of Department Kroshka Yulia Volodymyrivna.

Customer: detachable structural subdivision “Kyiv heat networks” of PJSC “KYIVENERGO”.

Period: October – December 2016

For the period of engineering – geodetic observations it was performed 6 measurement cycles sediment. The first cycle of observations was made before the construction works on strengthening of the foundations, the second, third and fourth cycles of observations made during construction works. The fifth and sixth cycles of observations was made after performing the construction works for strengthening of the foundations.

It was developed methodology of research for choosing the place of installation leveling and rail, which is adhered to throughout all cycles of observations to reduce the number of errors, the analysis of the obtained data with conclusions and recommendations.

The result of the work was the determination of the values of vertical displacement of the base of the building during and after construction works to strengthen the foundations of the building.

Our services

Our specialists

Our projects
"SE "RIBP" - your solving of every building tasks!"