Executive removing of the geometric parameters of arches indoor tennis court in Slavutych
Works were performed by specialists of the Department of instrumental control of construction and installation works under the direction of the head of Department Kroshka Yulia Volodymyrivna.
Client: municipal enterprise “Administration of development of physical culture, sport and tourism” Slavutych Council of Kyiv region (KP “UFKST”).
The deadline is December 2015.
Executive removing of the geometric parameters of arches indoor tennis courts was conducted with the aim of establishing the geometric parameters of arches for the further project works to strengthen arch structures .
Engineering-geodetic works on the executive shooting of the arches of the indoor tennis courts was completed in the following sequence:
geodetic measurement and adjustment of horizontal and vertical geodetic network
engineering-geodetic works on the executive survey of load-bearing elements of the roof and adjacent columns of the building frame.
The result of the work was the development of as-built drawings.