Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Borodynia Vitaliy Vitaliyovych, head of sector of experimental design

He was born 01 March 1974. In 2004 she graduated from Kyiv national University of construction and architecture, specialty “Urban construction and economy”.

Since 2004 till nowadays he works as head of the sector of experimental design in SE RIBP.

Work experience in the specialty in accordance with the direction of professional certification is 10 years.

Qualification certificate: project engineer (issued 18.12.14)

Kyiv national University of construction and architecture, 2004.

RIBP – head of the sector of experimental design 2004 till present time.

Work experience in the specialty in accordance with the direction of professional certification 10 years.

Qualification certificate project engineer.

Issued 18.12.14.

The main services that can provide specialist:

– ensuring mechanical resistance and stability;

– observance the requirements of fire security;

– security of life and health, protection of the environment;

– security of operation, protection against noise;

– ensuring energy savings;

– execution of engineering survey;

 technology of construction production;

estimate documentation

He performed the following works:

  1. Repairs and alterations to the device attic space within the attic of the house №41 on Tolstoy street, in the Holosiivskyi district of Kiev. (stage “working Draft” –ER) – customer CP “Spetszhitlofond” in 2007.
  2. Renovation and redevelopment of residential building 47 on the Tolstoy street, in Pechersk district of Kyiv(stage “working Draft” –ER) – customer CP “Spetszhitlofond, 2008.
  3. Development of Project and design documentation in two stages (stage “Project” – P and “working documentation” – G), repair house for the office center on the Vorovskoho 34 street, letter “b” in the Shevchenko district of Kyiv – the customer KP Spetszhitlofond” 2009.
  4. Development of project of the completion of unfinished construction object – a bus Park and construction of the production base to maintain and control vehicles and satellite communication systems Electrotehnichna 47 Street in Desnianskyi district of Kyiv (stage – project “P”)
  5. Repair of redevelopment of apartments of the house on  Koltsov Boulevard, 24-and in the Svyatoshynskyi district of Kyiv (stage “working Draft” –ER) – customer CP “Spetszhitlofond” 2010.
  6. Repair of redevelopment of apartments of the house in Keramichnyi 7 backstreet  including the renovation of its facade and roof in theHolosiivskyi district of Kyiv. (stage “working Draft” –ER) – customer CP “Sptszhitlofond 2011
  7. Calculation of influence of new construction on surrounding buildings (house No. 70, No. 74, No. 74-a) at 40 years of October Street inHolosiivskyi district of Kyiv. – customer CP “Spetszhitlofond” 2013
  8. Scientific and technical supervision at the construction site of the Construction of a residential house on the Teremkivska 3 street. in Holosiivskyi district of Kyiv – the customer KP Spetszhitlofond” 2015 -2016.

Objects and projects of the specialist

Our projects
"SE "RIBP" - your solving of every building tasks!"