Order of call back




State "Research institute of building production named of V.S. Balitsky" (Кyiv)

Development of the project design documentation with pits and retaining walls construction

SE “RIBP” performs development of the project design documentation with the fencing of pits and retaining walls arrangement.

    During the construction of buildings it is used bored piles or “wall in the ground” technology. As fasteners we use thrust elements, anchor fixing or «Top down» technology.

    The work is performed in the construction of deep pits in difficult geological conditions and compacted construction and in the construction of retaining walls on the landslide-prone slopes.

    Development of the project design documentation is regulated by REN 316-88 «Technology and mechanization of construction of anti- filtered palls and monolithic load bearing walls via “walls in ground” method.

    The work is performed in two stages:

– Performance of the variant calculations with a choice of optimum constructive-technological scheme;

– Development of the project design documentation.

    To perform variable calculations it is used «PLAXIS-2D, 3D».software package.

     Within this service SE “RIBP” performed the following works:

  1. Drafting walling project of fencing constructions performed via «wall in the ground” method during the construction of the underground part of a residential complex, Teremkivska street, Holosiivsky district, Kyiv, work project stage”, 2007.
  2. Drafting of fencing constructions performed via «wall in the ground” method, the construction of the underground complex of public facilities and residential destination, Dehtyarivska 6-7, 7a street, Kopernik 12a and 12 street, Shevchenko district. Kyiv, “Project” stage, 2008.

Our services

Our projects
"SE "RIBP" - your solving of every building tasks!"