The sector of experimental design
The sector was established in 2004 and during this time it has become a leading unit in the field of engineering design and inspection of the technical condition of buildings (civil, industrial, and technical). Over the years, the sector experts developed a project and conducted a review of more than 500 objects.
Our reliable clients are KP “Spetszhilfond” KP “Zhilstroyinvest” and others.
In the sector work the following employes:
- Head of sector – Borodynia, V. V.
- Head ofgroup, Ph. D. – Terentiev O. O.
- Civil engineer of 1 cat. – Patkovska O. I.
- Design engineer of 2nd cat. – Ostrovsky V. O.
- Young. Sciences. et al. – Parkhomenko O. O.
- Consultant, Ph. D. Professor Mikhaylenko V. M
The main services of sector:
Civil engineering design in part:
– ensuring mechanical resistance and stability;
– observance of requirements of fire security;
– security of life and health, protection of the environment;
– security of operation, protection against noise;
– ensuring of energy savings;
– execution of engineering survey;
–technology of construction production;
–estimate documentation.
The list of completed works:
- Repairs and alterations to the device attic space within the attic of the house №41 on Tolstoy Street, in the Holosiivsky district of Kyiv. (stage “working Draft” –ER) – customer CP “Speczhilfond” in 2007.
- Renovation of redevelopment of residential building № 47 on Chervonoarmiyska street, in Pechersk district of Kyiv. (stage “working Draft” –ER) – customer CP “Speczhilfond” 2008
- Development proyektno-budget documentation in two stages (stage “Project” – P and “working documentation” – G), repair house for the office center on the street Vorovskogo, 34 letter “b” in the Shevchenko district of Kyiv – the customer KP “Spetszhilfond” 2009
- Development of the project the completion of unfinished construction object – a bus Park and construction of the production base to maintain and control vehicles and satellite communication systems, Electryctrotekhnichna 47 Street in Desnianskyi district of Kyiv (stage – project “P”)
- Repair and redevelopment of apartments of the house on the Boulevard of Koltsova, 24-and in the Svyatoshinsky district of Kyiv (stage “working Draft” –ER) – customer CP “Speczhilfond” 2010
- Repairs and alterations to the house in Boulevard of Keramichyi 7, including the renovation of its facade and roof in the Holosiiivsky district of Kyiv (stage “working Draft” –ER) – customer CP “Speczhilfond” 2011
- Calculation of influence of new construction on surrounding buildings (house No. 70, No. 74, №74-a) at vul. 40 years of October in Holosiiivsky district of Kyiv – customer CP “Speczhilfond” 2013
- Scientific and technical supervision at the construction site of “Construction of residential houses on Tereska3 street, in Holosiivskyi district of Kyiv – the customer KP “Spetszhilfond” 2015 -2016.